Sziasztok,

Nem tuti hogy ez blog lesz, de valahova fel kell rakni a linkeket :)

Linkek:

 

Az általam alkalmazott szabályok (az excelhez):

Kanban rules:

·         No row or column (phase) can contain more element than it is written on top of it

·         No  element can stay in place for more than  two consecutive days, or it should be treated as exception

·         Priorities can be changed anytime inside columns

·         Forced movement between columns can happen only once per day (eg: task removal)

·         Task becomes red if:

o   More than two consecutive days in place

o   Moves backwards (especially from acceptance phase)

·         Intro & exit rules:

o   Task list:

§  Enters: When we get knowledge of it, or we can’t work on it for some reason (example: more important task)

§  Exits: if it’s the top item, and a preparation item is removed

o   Preparation:

§  Enters: if we decide we look at it

§  Exits: if specification & design are complete & reviewed by architect

o   Implementation:

§  Enters: if preparation is complete, developer assigned

§  Exits: if software is release-ready, and reviewed by the architect

o   Acceptance:

§  Enters: when committed to version control

§  Exits: when accepted on trunk by the customer

 